Sunday, March 27, 2011

Day Two of Nursery Makeover

After a hearty breakfast of baked breakfast burritos and a trip to Home Depot for an air compressor the boys were ready to get started with putting up the molding and bead board.  They worked the day away and were ready to call it a day around 8pm.  Check out their progress!

The first piece is in place.

Bottom molding is done.

Working together.

Trying to figure out how to cut around the electrical outlet.
The long wall has begun.

That darn window makes things tricky.

The long wall is complete, minus the top molding.

More of the long wall.

Craig working hard around that window.

Making cuts.

While the boys worked hard Ginger and I took off to run some errands in order to stay out of their way.  We headed to Target to look for a curtain rod and crib mattress (no luck on the mattress) and then down to Sugar Babies to have a look and grab the crib bedding.  We then decided to head to Babies R Us to get the mattress since we'd struck out at Target.  We are bound and determined to have the nursery done by the end of next week!

The bedding set!

1 comment:

  1. This is going to be sooooo cute!!!!!! I can't wait to see the finished pictures!

    ReplyDelete